Post

Pitot Tube Preparation

Pitot tube was prepped, in terms of plumbing, to be installed later when working on the Left wing.

Pitot Tube Preparation

We prepped the pitot tube which will be used later for installation on the left wing. The pitot tube is Garmin Gap26 heated and regulated pitot tube.

Plumbing

The 3/8" aluminum tubes for Pitot and AoA on the Gap26 probe was trimmed, flared and some tube push connectors were installed. prep-1 Trimming the tube for sizing. prep-2 Flaring tool. prep-3 Tube flared. prep-4 An fitting installed. prep-5 Teflon tape before installing the push connector. prep-6 Push connectors installed.

Avionics & Tools

This post is licensed under CC BY 4.0 by the author.