Fuselage Kit Inventory
Fuselage kit was opened and most of the parts were accounted for.
Fuselage kit was opened and most of the parts were accounted for.
Wing lights cover was installed, along with painting the metal strip inside.
Left wing aileron and flap were installed, along with aligning them.
Left wing inspection hatches as well as lights have been installed and wired.
Left wing tip was installed, very similar to how right wing tip was intalled.
Some left wing parts such as fuel pump as well as end rib has been installed along with removing from the jig.
Left tank was installed to the wing structure.
Left fuel tank was thorougly tested, and leaks were fixed as they were discovered.
Left fuel tank has been assembled and sealed with proseal, with same exact sequence and procedure as the righ wing.
Left wing upper skin and landing light skin have been riveted to the wing structure.