Right Tank Attached
Right tank has been attached to the right wing, in the process a few things had to be taken care of, but the attachment was a very tight fit, by design.
Right tank has been attached to the right wing, in the process a few things had to be taken care of, but the attachment was a very tight fit, by design.
Testing of the right tank has been completed, in the process a few patches had to be made.
The assembly of the right wing aileron is done upto the alignment step on to the wing.
Right fuel tank has been assembled, riveted, and sealed.
Pitot tube was prepped, in terms of plumbing, to be installed later when working on the Left wing.
Assembly for the right wing upper skin as well as landing light leading edge skin is complete.
Wiring for the right wing lights have been completed.
Both the fuel tanks were temporarily assembled using clecos, while the rest of the wing is being worked on.
Fuel tank skeleton is sealed and riveted together for both the tanks.
Fuel tank end ribs have been sealed.