Elevator Tip Skins Riveting + Inspection Hatch
Riveting for elevator tip skins is complete, and inspection hatch is also added.
Riveting for elevator tip skins is complete, and inspection hatch is also added.
Riveting for elevator inboard skins is complete.
Elevator trim tab has been assembled and tempeorarily attached to the elevator.
Elevator skins have been assembled tempeorarily using clecos.
Assembly for horizontal stabilizer left skin is complete.
Assembly for horizontal stabilizer right skin is complete.
Assembly for elevator internal components is complete.
Assembly for some of the elevator ribs is complete.
Horizontal stabilizer ribs assembly is complete.
Dimpling for horizontal stabilizer ribs is complete.