Right Wing Tip + Light Installation
Right wing tip was installed, along with lights installation.
Right wing tip was installed, along with lights installation.
Both the wing tips were prepped for installing the lights later.
Ring wing tip is being prepared for riveting later.
While, applying upper and lower skins, we initially forgot to add the reinforcement plates, so had to drill out a good amount of the rivets, and add the plates.
The assembly of the right wing flap is done upto the alignment step on to the wing.
Right wing tip rib has been attached to the wing, additionally, the wing jigs have been removed.
Right tank has been attached to the right wing, in the process a few things had to be taken care of, but the attachment was a very tight fit, by design.
Testing of the right tank has been completed, in the process a few patches had to be made.
The assembly of the right wing aileron is done upto the alignment step on to the wing.
Right fuel tank has been assembled, riveted, and sealed.